Comprehensive HVAC maintenance project at Bancolombia’s main headquarters. The works included:
- Replacement of bearings in cooling tower motors and fans, with laser alignment.
- Preventive maintenance of 560 fan boxes located under false ceiling.
- Replacement of 8 variable-frequency drives due to technological. obsolescence.
- Preventive maintenance of the chiller, air-handling units, ventilation system, and BMS.