Comprehensive refurbishment featuring full systems integration, designed according to high-availability, redundancy, and energy-efficiency criteria, aimed at achieving TIER III
Installations
- HVAC: 4 chillers with eco-friendly refrigerant, 3,200 kW capacity, and 6 backup tanks.
- IT Refrigeration: precision units for CPDs.
- BMS: building management system to control HVAC, fire alarm and life & safety.
- Fuel: power supply system for generators with underground tanks and automated transfer.
- Leak Detection: system connected to the BMS controlling water and diesel.
- Fire Suppression: early detection, automatic extinguishing, and system shutdown
- Water Mist Suppression: in CPD and IT rooms, including redundant dual pumps.