Fariones Suite Hotel

Cliente:

Plus Fariones

País:

Spain

Años:

2019 and 2024

Descripción:

Comprehensive refurbishment of the MEP installations in a hotel of 229 guest rooms, front of house areas, and MEP rooms, with works including HVAC, plumbing, sewage, fire suppression, and pool installation. 

Heating and Hydraulic Systems

MEP rooms are equipped with water to water chillers with seawater dissipation, connected to shallow wells adapted to the proximity of the coastline. The system uses pool pumps as an optimized solution compared to submersible pumps, prioritizing economic and operational efficiency. 

Domestic hot water (DHW) supply is carried out through instantaneous water tanks, eliminating storage and minimizing bacteriological risks such as Legionella. This configuration complies with sanitary criteria and energy efficiency standards.

Plumbing & Sewage

Complete renewal of water supply and wastewater system aligned with operational demand and comfort standards.

Fire Suppression and Fire Alarm

Installation includes hose reels, automatic sprinklers, fire alarm, and fire booster pumps, calculated to protect all areas of the building in compliance with current regulations. 

Pool Installation

Pool thermal systems integrate energy recovery from HVAC equipment, enhancing the overall operational efficiency of the hotel.