Newly built shopping mall located in Arrecife. Installations for HVAC, plumbing, sewage, and fire suppression.
HVAC
Installation consisting of a main pump room incorporating titanium heat exchangers supplied by water drawn from several wells drilled within the plot. From there, chilled water is distributed to each commercial space, providing the necessary supply for the operation of the specific equipment installed by each tenant.
Plumbing
Booster pump and pipes calculated to meet requirements following criteria of efficiency and service continuity.
Sewage
Wastewater and stormwater installation.
Fire Suppression & Fire Alarm
A comprehensive fire installation including fire alarm, fire hydrants, fire hose reels, and automatic sprinklers, calculated in accordance with current regulations for public-access facilities and aimed at ensuring the building’s operational safety