BANCOLOMBIA COB NIQUÍA

Client:

Bancolombia S.A.

Location:

Colombia

Date:

2011 – 2025

Description:

Technical servicing of the HVAC systems at Bancolombia’s Niquía operations center. The scope of work included:

  • Complete overhaul of 450-TR centrifugal chillers, replacing main components and upgrading BMS. 
  • Eddy Current testing of heat exchangers to determine wall-thickness loss in copper tubing 
  • Preventive maintenance of the chilled-water plant, air-handling units, ventilation system, and BMS.Forma