Rivana Business Park

HVAC installation in roof and office tower. Includes chilled-water plant, VRF systems, DOAs for outdoor air, mechanical ventilation, exhaust in technical areas and parking, and BMS/Bacnet mangement system. 

Sciences Building – Pontificia Javeriana University

Design and installation of specialised HVAC systems for more than 60 laboratories, including BSL-2 and BSL-3 spaces. The Design and implementation of specialized HVAC systems serving more than 60 laboratories, including BSL-2 and BSL-3 levels. The project features chilled-water and heating systems, 100% outdoor-air ventilation, HEPA filtration, precise environmental-control capabilities, and continuous operation, all aligned with […]

BANCOLOMBIA COB NIQUÍA

Technical servicing of the HVAC systems at Bancolombia’s Niquía operations center. The scope of work included:

BANCOLOMBIA Head Office

Comprehensive HVAC maintenance project at Bancolombia’s main headquarters. The works included:

Rivana Business Park 

Supply and installation of the air conditioning and ventilation systems in the South Tower of the Rivana Business Park, located in the heart of Medellín’s financial center. The project includes a state-of-the-art office tower, parking, commercial spaces, and a modern convention center. 

Guatapé Hydroelectric Power plant 

Supply, installation and commissioning of the smoke-exhaust system including in the MEP Room of the Guatapé Hydroelectric Power Plant.   It includes a system of three fans in a row (250 HP each one), with a single capacity of 72.000 CFM and a negative static pressure of 13,5 in H₂O.  Combined system performance:  Ductwork, fabricated from 16-gauge galvanized steel, extends approximately 2.4 km and features external reinforcements made of […]

Shopping Mall Florida 

Installation of water-cooled condensation systems including cooling towers, pumps, steel and PPR pipes, exhaust systems in bathrooms and carpark; Includes also the BMS system to manage the HVAC equipment.

Jardín Building 

Air conditioning system for a hospital building comprising 100 rooms, procedure rooms, and MEP rooms. The HVAC installation includes multipurpose chillers, chilled beams, AHUs with MERV and HEPA filters, and purification and redundancy systems to ensure continuous operation.