Forum Hotel Barcelona

Mechanical installations in a 5-star luxury hotel with a total of 467 guest rooms, including suites. The project includes the execution of the following installations:
Tower One Finestrelles Building

Mechanical installations for a high-rise student residence/hotel (25 floors, podium, mezzanine, and three basement levels). The project scope includes:
Educational centre – Xàbia International College

Installations include sewage, plumbing, domestic hot water (DHW), electrical systems, ELV installation, solar panels, HVAC and fire suppression. The scope includes water supply system, water treatment, electrical panel boards, lighting, generator, data and video-intercom systems, a 20 kW photovoltaic installation, VRF equipment designed according to bioclimatic principles, and fire alarm and suppression systems.
New Library and Administrative Headquarters of the Sarria-Sant Gervasi District

Execution of plumbing, electrical, HVAC, fire suppression, public address, data, access control, security, and intrusion detection systems. The project includes the installation of HVAC system designed according to bioclimatic construction principles. This approach aims to minimize environmental impact by utilizing natural resources and local climatic conditions, while ensuring interior comfort and high energy efficiency.
Node Hotel

Project by Momentum as investor and Node (temporary accommodation specialist) to develop a mid-term rental hotel. NH has a total of 707 residential spaces. ATIL COBRA has carried out HVAC installations, including advanced systems for air conditioning, ventilation, and heating, meeting the comfort and energy-efficiency requirements of the complex. The building has 21 levels, with […]
Acciona Campus

Newly constructed building located in the MESENA Campus, featuring advanced technical installations for HVAC, fire suppression, BMS, in the main building and annex buildings. Installations:
Terminal Renovation at the Port of Tarifa

Refurbishment installation at the Port of Tarifa terminal, improving HVAC system, electrical supply and the technical organization of the building. Works include: The project adheres to principles of functionality, environmental comfort, and technical enhancement of the terminal, strengthening the infrastructure to ensure efficient and safe operations.
Fariones Suite Hotel

Comprehensive refurbishment of the MEP installations in a hotel of 229 guest rooms, front of house areas, and MEP rooms, with works including HVAC, plumbing, sewage, fire suppression, and pool installation. Heating and Hydraulic Systems MEP rooms are equipped with water to water chillers with seawater dissipation, connected to shallow wells adapted to the proximity of the coastline. The system uses pool pumps as an optimized solution compared to submersible pumps, prioritizing economic and […]
Fariones Hotel

Comprehensive refurbishment installation in resort with 213 guest rooms, front of house areas, and MEP rooms, improving performance and efficiency HVAC Air conditioning system consisting of water chillers cooled by seawater, supplied from several collection wells. Domestic hot water is produced by high-temperature split units that guarantee a supply of 75°C, creating a highly efficient system for continuous and variable use. Plumbing and Sewage Installations Both installations are […]
Garavilla Shopping Mall

Newly built shopping mall located in Arrecife. Installations for HVAC, plumbing, sewage, and fire suppression. HVAC Installation consisting of a main pump room incorporating titanium heat exchangers supplied by water drawn from several wells drilled within the plot. From there, chilled water is distributed to each commercial space, providing the necessary supply for the operation of the specific equipment installed by each tenant. Plumbing Booster pump and pipes calculated to […]